Geosynthetics help remove water from Missouri bridge pavement

Due to the success of the H2Ri on the Daniel Boone Project, MoDOT has continued to look for opportunities to utilize it in designs where reoccurring moisture problems have proved to be unfixable.

The Daniel Boone Bridge Design-Build Project began with an investigation by the Missouri Department of Transportation (MoDOT) in the early 2000s. The goal was to replace the westbound span, which was built in 1935 and was never intended to handle modern interstate-level traffic. MoDOT’s studies concluded that the narrow lanes, constant traffic and high maintenance costs necessitated a complete replacement of this span. In 2011, MoDOT allocated $125 million in funding for the project. In 2012, a design-build contract was awarded to the Walsh-Alberici joint venture team with Burns & McDonnell as the design engineer.

Removing the Water

During the initial design phase for the bridge approaches, it became clear that saturated soil conditions would require water to be removed from under the pavement sections. Typical design solutions for this problem would be installing thick, drainable aggregate sections or wick drains, which can add considerable cost to the pavement section. MoDOT encouraged the design-build teams to explore new and innovative technologies to solve the challenging site conditions.

Burns & McDonnell contacted TenCate Geosynthetics to explore the utilization of Mirafi H2Ri high-strength wicking geosynthetic. This technology has a design that not only provides tradtional geosynthetic characteristics to stabilize the roadway, but also has the ability to drain saturated and unsaturated subgrades.

“The numerous geosynthetic research studies and in-field performance from a previous Alaska DOT project really helped sell this solution to MoDOT,” said Mike Lack, manager, alternative pursuits, for Walsh Group.

The objective was to remove water from underneath the pavement section. The design-build team originally designed a pavement section that included a 4-in. layer of drainable aggregate and 4 in. of road base aggregate with a concrete section, all on top of prepared subgrade. The geosynthetic was intended to replace the 4 in. of drainable base, thus providing equivalent capabilities within the section while reducing overall costs. The strength of the geosynthetic, which also provides confinement and separation, allowed for a 2-in. overall reduction in aggregate base material, along with the ability to wick water from under the pavement. The water was able to exit the product through a combination of day lighting the material onto roadway shoulders and into French drains.

“As the prime engineering firm on the Walsh-Alberici design-build team submitting a proposal for the MoDOT Daniel Boone Bridge Project, we were tasked with exploring new and innovative solutions,” said Jeff Mues, St. Louis regional transportation practice leader for Burns & McDonnell. “This included materials not currently included in MoDOT’s standard plans and specifications. Working with TenCate Geosynthetics, we were able to eliminate costly drainable aggregate and underdrains through the inclusion of the wicking geosynthetic. The geosynthetic material also allowed us to eliminate 2 in. of aggregate and maintain the designed pavement life.”